Eldorado ParkwayThe Eldorado Parkway (FM 720) Widening Project is an important component in regional efforts to ensure an infrastructure that will safely and conveniently accommodate the expected increase in residents, visitors and customers.

Eldorado Parkway (FM 720) was let for construction in July 2010. The winning bid was $55 Million, submitted by J.D. Abrams. Work is expected to begin October 2011 and conclude in the Spring of 2015. There will be 566 contract days and 30 months of barricades.
This project consists of a half mile six lane bridge over Lewisville Lake, a single span bridge over Peach Creek, and a three-span bridge over Hart’s Branch. Included in the design are 27 side street intersections, 5 signals, 25 retaining walls, urban storm sewer and culvert crossings, aesthetic treatments, and storm water treatment units approved by the U.S. Army Corps of Engineers. The road work in Little Elm will involve widening approximately four miles of Eldorado Parkway (FM 720) from Little Elm Park-way West to French Settlement.
Additional Project Details – Little Elm Eldorado Parkway Construction Guide.